Showing posts with label Glen-L. Show all posts
Showing posts with label Glen-L. Show all posts

Saturday, March 3, 2007

Photos of Construction of Box and Walls

Here are a few photos of the construction of the box and walls:


Box finished.


Lay-out of framework - on top of Glen-L plans.


Framework for side wall with corner braces.


Framework for back wall with corner braces.


Skinned walls with 1/8" Luana plywood.


Back wall with door opening put in place.
Note: Windows were cut out with plunge router.



Front wall added to box.